MTR, Tung Chung West Station and Tunnels Client: Bouygues - Dragages JV / Aecom Scope: Registered Structural Engineer Services Design Build contract of a MTR underground station and TBM tunnels, with an 1.3 km extension from Tung Chung Stati... Railway
Airport Authority, Third Runway System Airfield Pavement and Apron Works Client: Yunnam No. 4 Construction Co Ltd (YCIH) Scope: Project Management, Safety, Environmental & Quality Mgt, and Claims Consultant 雲四馬董事長親臨香港参與管理計劃工作坊 State Enterprise YCIH has annual revenue RMB12... Airport
Architectural Services Department, Construction of Liantang/Heung Yuen Wai Boundary Crossing Point (BCP) – BCP Buildings and Associated Facilities Client: Leighton Contractors (Asia) Ltd Scope: Tender Design Support Tender Successful – Contract Sum $7.11 Billion BCP Facilities include Passenger Terminal Building, HKPF Operational Base, Fire Stat... Infrastructure
MTR, Station Commercial and Improvement Works at Fo Tan Station Client: Chun Wo Construction and Engineering Co. Ltd Scope: Independent Checking Engineers, RSE and Temporary Works Coordinator Services The project involves construction of demolition and AA works of... Railway
Highways Dept, Universal Accessibility Facilities at Footbridges, Elevated Walkways and Subways – Package 7 Contract 2 Client: Vernaltex Company Ltd Scope: Tender design using MiC/DfMA Design of 46 lifts at 30 walkways located in Central and Western District, Kowloon City, Kwai Tsing, Kwun Tong, Wong Tai Sin, Sai Kung... Road & Railway
Central – Wanchai Bypass – Highways Dept Tunnel Buildings, Systems and Fittings and Works Associated with Tunnel Commissioning Client: Leighton Contractors (Asia) Ltd Scope: Tender Design Support Service Tender Successful – Contract Sum $3.18 Billion Tender involves construction of Tunnel Ventilation Buildings and Vent Shaft,... Infrastructure
Railway Development Office – Checking of Seismic Design for Kwu Tung Station on East Rail Line Seismic design checking on the Arup’s station design on compliance with MTRCL’s New Works Design Standards Manual in the validity of design concepts, methods and assumptions adopted; and design of sup... Road & Railway
Condition Survey We provide condition survey to infrastructures and assess facilities affected, and e.g. existing sewerage treatment plants remedial design proposals 水務署鑽石山食水及咸水配水庫迁往地下岩洞項目 渠務署昂船洲污水處理廠 水務署荃灣2号食水塘迁往地下岩洞...
Drainage Services Dept, Sewer at Kam Tin, Tan Kwai Tsuen and Tong Tan Sang Tsuen and Modifications to Siu Ho Wan Sewage Treatment Works Client: China Geo-Engineering Corporation Scope: Independent Checking Engineer... Road & Drainage
Highway Department, Investigation for Provision of Covers on Walkways, Package 3 – North, Tai Po, Sai Kung and Tsuen Wan Highways Dept Agreement Signing Ceremony ACABAS Submission... Road & Drainage
CEDD, Liantang / Heung Yeun Wai Boundary Crossing Point, Site Formation and Infrastructure Works (Contract 6) Client: Leighton Contractors (Asia) Ltd Scope: Tender Design Support Service The tender involves works including construction of a dual two-lane trunk road (with about 0.4km of at-grade road and 4.8km... Infrastructure
Highways Department, Hong Kong- Zhuhai – Macao Bridge, Hong Kong Boundary Crossing Facilities (HKBCF) - Passenger Clearance Building (PCB) Client: Leighton – Chun Wo Joint Venture Scope: Tender Support Service Tender Successful – Contract Sum $8.4 Billion The tender involves construction of Passenger Clearance Building, drop off deck / a... Infrastructure